Where I part company with post #89, and it is a narrow parting.
A chromatogram supplied as a small image is legible for peak shape and not for baseline detail. That is enough to sanity-check an integration and not enough to reproduce it.
This is a continuation of a long topic, addressed by post number rather than by page. Start at post 1 · go to the accepted answer.
Where I part company with post #89, and it is a narrow parting.
A chromatogram supplied as a small image is legible for peak shape and not for baseline detail. That is enough to sanity-check an integration and not enough to reproduce it.
Post #89 is the version of this I will quote in future. One addition.
Checked the field-by-field walk through a certificate claim against the primary source this morning. It survives, with a narrower scope than the version quoted here. Posting the narrower scope.
"Not less than 98 per cent" is a specification. "98.3 per cent" is a result. A certificate carrying only the first has not told you what was measured.
The number is defensible. The precision I gave it is not.
Reading old certificates: if a certificate is dated years ago, the lot it describes might be old. That is not automatically a problem but it is worth noting. Fresh testing on the current lot is stronger than old testing on an older lot.
The strength of my opinion here exceeds the strength of my evidence.
A note on how field-by-field walk through a certificate gets discussed rather than on field-by-field walk through a certificate itself: the confident posts get the replies and the careful ones get ignored, and the careful ones have been right more often.
Confirming post #93 from a second method, which matters more than confirming it from a second person.
The distinction between release testing and characterisation is one industrial documents make and retail ones usually do not. It is the difference between "we tested every lot for this" and "we established this once".
My position on field-by-field walk through a certificate is current rather than settled. I have revised it once already and I expect to again, so treat it accordingly.
What fields matter on a certificate: lot number matching the vial, test date, the analytical method stated specifically, the measured result as a number, and the acceptance limit stated separately. A certificate missing any of these is weaker.
I would treat that as a working assumption and revisit it.
I read post #97 twice before replying, because I had assumed the opposite.
Field-by-field walk through a certificate looks different depending on whether you are reading the primary literature or the summaries of it, and the difference is not in our favour.
Post #101 answers the question as asked. The question underneath it is different.
Endotoxin testing is separate: a certificate of purity says nothing about endotoxin. A chemically pure preparation can carry a clinically significant endotoxin load. If endotoxin matters, it needs to be tested and reported.
Take the reasoning and check the arithmetic; I do not always get it right.
Asking for the batch record rather than the certificate is a reasonable request and the response to it is informative whichever way it goes.
Everything in post #101 holds. The case it does not cover is the one I have.
An honest declaration on field-by-field walk through a certificate: I have a prior here and it is strong enough that you should weight what I say downward. Stating it rather than hiding it.
An itemised related-substances table with retention times says considerably more about the synthesis than a single total. A total tells you how much is not the main peak and nothing about what it is.
I looked this up rather than remembered it, which is the right order.
When method identifiers are missing: "reversed-phase HPLC" is less specific than "reversed-phase HPLC at 214 nm on a C18 column with a 10 to 40% acetonitrile gradient over 20 minutes". The second lets someone reproduce the analysis. The first does not.
That is a fair summary of where the discussion has got to.
A chromatogram supplied as a small image is legible for peak shape and not for baseline detail. That is enough to sanity-check an integration and not enough to reproduce it.
That has been true for the cases I have seen and I have not seen many.
On field-by-field walk through a certificate I would separate what is worth knowing from what is worth acting on. The first list is long and the second is short, and conflating them is how threads get heated.
Confirming post #109 from a second method, which matters more than confirming it from a second person.
Reading old certificates: if a certificate is dated years ago, the lot it describes might be old. That is not automatically a problem but it is worth noting. Fresh testing on the current lot is stronger than old testing on an older lot.
I am aware this is the third time this month I have made this point.
I had written a reply contradicting post #110 and deleted it. Here is what survived.
The confident answers on field-by-field walk through a certificate and the well-sourced answers are not the same answers, which is the most useful thing I have learned reading this category.
Where I have landed on field-by-field walk through a certificate, having got it wrong once in public: the direction is clear, the magnitude is not, and anyone quoting a precise magnitude has borrowed it from somewhere that did not measure it.
An itemised related-substances table with retention times says considerably more about the synthesis than a single total. A total tells you how much is not the main peak and nothing about what it is.
Happy to be the one who is wrong here if it settles the question.
I will take the caveat as seriously as the claim, which is the point of putting it there.
The question underneath field-by-field walk through a certificate is usually "how would I tell?" rather than "what is true?", and that one has a method attached to it.
Write down what you would expect to see under each hypothesis before you collect anything. If they predict the same observation, collecting it will not help.
Worth separating two things that post #114 runs together.
"Not less than 98 per cent" is a specification. "98.3 per cent" is a result. A certificate carrying only the first has not told you what was measured.
Answering the field-by-field walk through a certificate question as asked, then the question I think is meant. As asked: yes, with the qualification below. As meant: it depends on how the first measurement was taken.
A certificate is a statement by its issuer that a defined test was performed on a defined lot and produced a defined result. That is all it is, and it is not nothing.
I have deliberately not rounded that, because the rounding is where the argument starts.